Executive Summary

Summary

This article deals with what equipments are required to set up a building maintenance system, the different steps in running a maintenance department, when are computers needed, need to conduct a survey, etc. Before conducting the survey, ensure that the inspectors have all the necessary tools. Performing a survey must cover the entire property for maintenance and liability exposure. Decide on what all steps are required by the Clipboard Control System for a work order. It also talks about the Maintenance Cycle which includes five categories of work, the different types of work, etc.